Permit: TR-ROW-0326-00318
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2381 N CAMINO MATEO
Address NEW:
2381 N CAMINO MATEO
Apply Date:
03/19/2026
Applicant:
ALICIA OROZCO
Description:
1-40 YRD ROLL OFF TO BE DELIVERED ON 04/10 AND REMOVED ON 4/13 WILL BE PLACED SOUTH OF THIS AREA AT CAMINO MATEO AND EMILIANO /HYDRANT AND ALLEY WILL NO BE BLOCKED
Permit Reviews
Permit Number - TR-ROW-0326-00318
Permit Status: Complete
Permit Description: 1-40 YRD ROLL OFF TO BE DELIVERED ON 04/10 AND REMOVED ON 4/13 WILL BE PLACED SOUTH OF THIS AREA AT CAMINO MATEO AND EMILIANO /HYDRANT AND ALLEY WILL NO BE BLOCKED
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00318
Permit Status: Complete
Permit Description: 1-40 YRD ROLL OFF TO BE DELIVERED ON 04/10 AND REMOVED ON 4/13 WILL BE PLACED SOUTH OF THIS AREA AT CAMINO MATEO AND EMILIANO /HYDRANT AND ALLEY WILL NO BE BLOCKED
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/23/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/23/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0326-00318
Permit Description: 1-40 YRD ROLL OFF TO BE DELIVERED ON 04/10 AND REMOVED ON 4/13 WILL BE PLACED SOUTH OF THIS AREA AT CAMINO MATEO AND EMILIANO /HYDRANT AND ALLEY WILL NO BE BLOCKED
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | rolloff has been removed | |
| 05/11/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | rolloff has been removed | |
| 05/11/2026 | TRSP - ROW - Final | Passed | rolloff has been removed |