Permit: TR-ROW-0326-00301
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address:
311 E CONGRESS ST
Address NEW:
311 E CONGRESS ST
Apply Date:
03/16/2026
Applicant:
Alexis Otero-Morales
Description:
Full road closure for Crane placement on 5th Ave between E Congress and N Toole Ave. Crane will be installing AC unit.*** PROPOSED TC SET UP 5AM
Permit Reviews
Permit Number - TR-ROW-0326-00301
Permit Status: Needs resubmittal
Permit Description: Full road closure for Crane placement on 5th Ave between E Congress and N Toole Ave. Crane will be installing AC unit.*** PROPOSED TC SET UP 5AM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/25/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00301
Permit Status: Needs resubmittal
Permit Description: Full road closure for Crane placement on 5th Ave between E Congress and N Toole Ave. Crane will be installing AC unit.*** PROPOSED TC SET UP 5AM
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 03/17/2026 | Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell. |
| 03/17/2026 | The following extended traffic control set-up times were approved: |
| 03/17/2026 | PRE-CON/SIDEWALK |
| 03/17/2026 | TNE |
| 03/20/2026 | An approved SunLink Track Access must be uploaded prior to the start of work; and for night work: An approved TNE must be uploaded prior to the start of work. |
| 03/20/2026 | Due to the presence of a bus stop/ Route in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts |
| 03/20/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |