Permit: TR-ROW-0326-00298
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1701 S COLUMBUS BL
Address NEW:
1701 S COLUMBUS BL
Apply Date:
03/16/2026
Applicant:
Alexis Otero-Morales
Description:
Replace 2 standard ramps and 8” of standard sidewalk.*** Contractor: Durazo Construction Corporation Contact: Billy Mossburg Phone: 520.609.9975 Email: billy@durazo.build
Permit Reviews
Permit Number - TR-ROW-0326-00298
Permit Status: Complete
Permit Description: Replace 2 standard ramps and 8” of standard sidewalk.***
Contractor: Durazo Construction Corporation
Contact: Billy Mossburg
Phone: 520.609.9975
Email: billy@durazo.build
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2026 | APPROVED |
Conditions
Permit Number - TR-ROW-0326-00298
Permit Status: Complete
Permit Description: Replace 2 standard ramps and 8” of standard sidewalk.***
Contractor: Durazo Construction Corporation
Contact: Billy Mossburg
Phone: 520.609.9975
Email: billy@durazo.build
| Date | Description | Comments |
|---|---|---|
| 03/20/2026 | Your project work requires that you contact the Tucson Unified School District to alert them and coordinate work as needed in school zones. | |
| 03/20/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. | |
| 03/20/2026 | Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. | |
| 03/20/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 | |
| 03/20/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| 03/20/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. | |
| 03/17/2026 | Traffic control set-up approved between 9AM - 3:30PM | |
| 03/17/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0326-00298
Permit Description: Replace 2 standard ramps and 8” of standard sidewalk.***
Contractor: Durazo Construction Corporation
Contact: Billy Mossburg
Phone: 520.609.9975
Email: billy@durazo.build
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Barricade per permit and tcp | |
| 03/25/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 03/27/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Work is complete | |
| 03/31/2026 | TRSP - ROW - Final | Passed | area restored to original or better |