Permit: TR-ROW-0326-00291
Permit Details
Apply Date:
03/13/2026
Applicant:
ANGEL MORALES
Description:
CIPP sewer line and replace existing concrete collars.
Permit Reviews
Permit Number - TR-ROW-0326-00291
Permit Status: In review
Permit Description: CIPP sewer line and replace existing concrete collars.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/13/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00291
Permit Status: In review
Permit Description: CIPP sewer line and replace existing concrete collars.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 03/13/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/13/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/13/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/16/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 03/16/2026 | If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
| 03/16/2026 | The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
| 03/16/2026 | There is an active Prop 411 project in the area which has already lowered utilities ahead of the milling/paving operation, so sewer manhole and cleanouts are not even accessible unless they're re-exposed. At this time, I recommend this work be postponed until after Prop 411 is complete around July 1st, 2026. If this is not possible; this will require coordination with Pima County Regional Wastewater Reclamation Department and with my contractor (Tucson Asphalt) as they hold a current RWRD Permit for sewer manhole adjustments. Not sure of the complexities of having another contractor enter the sewer asset, while my contractor is responsible/accountable for invert protection. If it is feasible to coordinate this work with the Prop 411 Contractor; work MUST be complete by April 1, prior to paving, as we are already under strict scheduling due to other civic events (i.e. Cyclovia; Spring Street Fair; University of Arizona Graduation |