Permit: TR-ROW-0326-00286
Permit Details
Apply Date:
03/12/2026
Applicant:
Blake McIntosh
Description:
Right of way permit to be able to put our roll-offs for Dorm move out with two 30 yard 'roll off' trash dumpsters.
Permit Reviews
Permit Number - TR-ROW-0326-00286
Permit Status: Complete
Permit Description: Right of way permit to be able to put our roll-offs for Dorm move out with two 30 yard 'roll off' trash dumpsters.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/12/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/19/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00286
Permit Status: Complete
Permit Description: Right of way permit to be able to put our roll-offs for Dorm move out with two 30 yard 'roll off' trash dumpsters.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/12/2026 | BARRICADES ARE REQUIRED AT ALL TIMES FOR ROLL OR PODS PLACED IN THE CITY R.O.W Roll-offs/dumpsters/pods 1. Roll-offs or Dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2. Roll-offs or Dumpsters shall keep lids on so that roll-off or dumpsters is kept covered when not in use. Plugs shall be kept in place. 3. Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4. Damaged containers shall be reported for replacement. |
| 03/12/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 03/12/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0326-00286
Permit Description: Right of way permit to be able to put our roll-offs for Dorm move out with two 30 yard 'roll off' trash dumpsters.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | All work completed roll off removed | |
| 06/01/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | All work completed roll off removed | |
| 06/01/2026 | TRSP - ROW - Final | Passed | All work completed roll off removed |