Permit: TR-ROW-0326-00281
Permit Details
Apply Date:
03/11/2026
Applicant:
Thelma Magallanes
Description:
This project involves repairing a section of sidewalk in front of the property that has become uneven due to tree root uplift. The work will restore the sidewalk to meet ADA accessibility requirements. The contractor will evaluate whether the height differential can be corrected through concrete grinding or if the affected sidewalk panel will need to be removed and replaced. The adjacent tree contributing to the uplift will also be removed to prevent further damage. Work is expected to occur on Saturday, starting around 9:15 AM and completed the same day. The sidewalk area immediately surrounding the work zone will be temporarily restricted for pedestrian safety, but no street closures are anticipated. Repair of an existing sidewalk section within the public right-of-way that has become uneven due to tree root uplift. Work will include evaluation of whether the concrete can be ground to remove the vertical displacement or if the affected sidewalk panel must be removed and replaced. No new structures will be installed. Equipment used will include small concrete grinding or demolition tools and basic equipment for tree removal. All work will restore the sidewalk surface to comply with ADA accessibility and City of Tucson right-of-way standards.
Permit Reviews
Permit Number - TR-ROW-0326-00281
Permit Status: Complete
Permit Description: This project involves repairing a section of sidewalk in front of the property that has become uneven due to tree root uplift. The work will restore the sidewalk to meet ADA accessibility requirements. The contractor will evaluate whether the height differential can be corrected through concrete grinding or if the affected sidewalk panel will need to be removed and replaced. The adjacent tree contributing to the uplift will also be removed to prevent further damage. Work is expected to occur on Saturday, starting around 9:15 AM and completed the same day. The sidewalk area immediately surrounding the work zone will be temporarily restricted for pedestrian safety, but no street closures are anticipated.
Repair of an existing sidewalk section within the public right-of-way that has become uneven due to tree root uplift. Work will include evaluation of whether the concrete can be ground to remove the vertical displacement or if the affected sidewalk panel must be removed and replaced. No new structures will be installed. Equipment used will include small concrete grinding or demolition tools and basic equipment for tree removal. All work will restore the sidewalk surface to comply with ADA accessibility and City of Tucson right-of-way standards.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 03/12/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/13/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00281
Permit Status: Complete
Permit Description: This project involves repairing a section of sidewalk in front of the property that has become uneven due to tree root uplift. The work will restore the sidewalk to meet ADA accessibility requirements. The contractor will evaluate whether the height differential can be corrected through concrete grinding or if the affected sidewalk panel will need to be removed and replaced. The adjacent tree contributing to the uplift will also be removed to prevent further damage. Work is expected to occur on Saturday, starting around 9:15 AM and completed the same day. The sidewalk area immediately surrounding the work zone will be temporarily restricted for pedestrian safety, but no street closures are anticipated.
Repair of an existing sidewalk section within the public right-of-way that has become uneven due to tree root uplift. Work will include evaluation of whether the concrete can be ground to remove the vertical displacement or if the affected sidewalk panel must be removed and replaced. No new structures will be installed. Equipment used will include small concrete grinding or demolition tools and basic equipment for tree removal. All work will restore the sidewalk surface to comply with ADA accessibility and City of Tucson right-of-way standards.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/13/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 03/13/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/13/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0326-00281
Permit Description: This project involves repairing a section of sidewalk in front of the property that has become uneven due to tree root uplift. The work will restore the sidewalk to meet ADA accessibility requirements. The contractor will evaluate whether the height differential can be corrected through concrete grinding or if the affected sidewalk panel will need to be removed and replaced. The adjacent tree contributing to the uplift will also be removed to prevent further damage. Work is expected to occur on Saturday, starting around 9:15 AM and completed the same day. The sidewalk area immediately surrounding the work zone will be temporarily restricted for pedestrian safety, but no street closures are anticipated.
Repair of an existing sidewalk section within the public right-of-way that has become uneven due to tree root uplift. Work will include evaluation of whether the concrete can be ground to remove the vertical displacement or if the affected sidewalk panel must be removed and replaced. No new structures will be installed. Equipment used will include small concrete grinding or demolition tools and basic equipment for tree removal. All work will restore the sidewalk surface to comply with ADA accessibility and City of Tucson right-of-way standards.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/06/2026 | TRSP - ROW - Final | Passed | Sidewall repaired to eliminate tripping hazard. |