Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
4410 S PARK AV
Address NEW:
4410 S PARK AV
Apply Date:
03/04/2026
Applicant:
Joseph Riesgo
Description:
Installing new "right of way" driveways for new COT building Safety Complex. Pour new concrete and asphalt patch. Install new traffic signals for fire department Station 10 and new driveways for the fire and police station. TD-DEV-0423-00198

Permit Reviews

Permit Number - TR-ROW-0326-00260
Permit Status: Inspections
Permit Description: Installing new "right of way" driveways for new COT building Safety Complex. Pour new concrete and asphalt patch. Install new traffic signals for fire department Station 10 and new driveways for the fire and police station. TD-DEV-0423-00198
Start Date Submittal Complete Date Status  
03/11/2026 RIGHT-OF-WAY REVIEW v.2 04/06/2026 REQUIRES RESUBMIT Review Details
04/06/2026 RIGHT-OF-WAY REVIEW v.3 04/09/2026 APPROVED Review Details
03/05/2026 RIGHT-OF-WAY REVIEW v.1 03/10/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0326-00260
Permit Status: Inspections
Permit Description: Installing new "right of way" driveways for new COT building Safety Complex. Pour new concrete and asphalt patch. Install new traffic signals for fire department Station 10 and new driveways for the fire and police station. TD-DEV-0423-00198
Total Outstanding Activity Conditions - 6
Date Name
03/12/2026 PRE-CON/SIDEWALK
03/12/2026 Traffic Control set-up approved between 9AM - 3:30PM
04/09/2026 - Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk.
04/09/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
04/09/2026 Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices
04/09/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0326-00260
Permit Description: Installing new "right of way" driveways for new COT building Safety Complex. Pour new concrete and asphalt patch. Install new traffic signals for fire department Station 10 and new driveways for the fire and police station. TD-DEV-0423-00198
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/15/2026 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
C4.4_ GRADING - DRAINAGE PLAN REV.0_V1.PDF DOCUMENTS VIEW
CORE FD POLES_V1.PDF DOCUMENTS VIEW
RIGHT OF WAY FOR TRAFFIC SIGNALS_V1.PDF DOCUMENTS VIEW