Permit: TR-ROW-0326-00259
Permit Details
Apply Date:
03/04/2026
Applicant:
Alexis Otero-Morales
Description:
Address Correction - 617 N 6TH AV Replace Asphalt patch 10ftL x 55ftW x 6in D*-* Contractor: Tucson Asphalt Contact: Keith Gamble Phone: 520-990-0501 Email: Keith@tucsonasphalt.com
Permit Reviews
Permit Number - TR-ROW-0326-00259
Permit Status: Issued
Permit Description: Address Correction - 617 N 6TH AV
Replace Asphalt patch 10ftL x 55ftW x 6in D*-*
Contractor: Tucson Asphalt
Contact: Keith Gamble
Phone: 520-990-0501
Email: Keith@tucsonasphalt.com
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/05/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 03/10/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/17/2026 | REQUIRES RESUBMIT |
| 04/03/2026 | RIGHT-OF-WAY REVIEW v.4 | 04/06/2026 | APPROVED |
| 03/26/2026 | RIGHT-OF-WAY REVIEW v.3 | 03/31/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00259
Permit Status: Issued
Permit Description: Address Correction - 617 N 6TH AV
Replace Asphalt patch 10ftL x 55ftW x 6in D*-*
Contractor: Tucson Asphalt
Contact: Keith Gamble
Phone: 520-990-0501
Email: Keith@tucsonasphalt.com
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 03/11/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 03/11/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/11/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/17/2026 | The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
| 04/06/2026 | - Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 04/06/2026 | Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 04/06/2026 | If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
| 04/06/2026 | The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
| 04/06/2026 | The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |