Permit: TR-ROW-0326-00249
Permit Details
Apply Date:
03/02/2026
Applicant:
ANGEL MORALES
Description:
CIPP Sewer Line, Replace existing concrete collar around sewer manhole.
Permit Reviews
Permit Number - TR-ROW-0326-00249
Permit Status: Inspections
Permit Description: CIPP Sewer Line, Replace existing concrete collar around sewer manhole.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/02/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/16/2026 | REQUIRES RESUBMIT |
| 03/20/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00249
Permit Status: Inspections
Permit Description: CIPP Sewer Line, Replace existing concrete collar around sewer manhole.
Total Outstanding Activity Conditions - 10
| Date | Name |
|---|---|
| 03/03/2026 | BUS STOP/ ROUTE |
| 03/03/2026 | PRE-CON/SIDEWALK |
| 03/03/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/25/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 03/25/2026 | Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way |
| 03/25/2026 | Continuous ADA-compliant pedestrian access shall be maintained at all times. If crosswalks or sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices |
| 03/25/2026 | If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
| 03/25/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 03/25/2026 | The contractor shall coordinate all construction activities and traffic control with other active projects and traffic control operations in the area. Traffic control shall be adjusted as necessary to avoid conflicts and maintain safe traffic flow. |
| 03/25/2026 | The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0326-00249
Permit Description: CIPP Sewer Line, Replace existing concrete collar around sewer manhole.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | starting Tuesday night of next week |