Permit: TR-ROW-0326-00247
Permit Details
Apply Date:
03/02/2026
Applicant:
ANGEL MORALES
Description:
CIPP Sewer Line, Replace existing concrete collars around sewer manholes
Permit Reviews
Permit Number - TR-ROW-0326-00247
Permit Status: In review
Permit Description: CIPP Sewer Line, Replace existing concrete collars around sewer manholes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/02/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/19/2026 | REQUIRES RESUBMIT |
| 03/26/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00247
Permit Status: In review
Permit Description: CIPP Sewer Line, Replace existing concrete collars around sewer manholes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 03/03/2026 | BUS STOP/ ROUTE |
| 03/26/2026 | The following extended traffic control set-up times were approved: 9pm to 5 am. |
| 03/26/2026 | Message board Placement 7 days in Advance of Start of Work |
| 03/26/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 03/26/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 04/22/2026 | Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell. |