Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1700 N TUCSON BL
Address NEW:
1700 N TUCSON BL
Apply Date:
03/31/2025
Applicant:
LYZETTE CELAYA
Description:
Renew in 90 days as of 06/08/2025 new expiration date 09/06/2025 The contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.

Permit Reviews

Permit Number - TR-ROW-0325-00420
Permit Status: Complete
Permit Description: Renew in 90 days as of 06/08/2025 new expiration date 09/06/2025 The contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Start Date Submittal Complete Date Status  
04/02/2025 RIGHT-OF-WAY REVIEW v.1 04/08/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0325-00420
Permit Status: Complete
Permit Description: Renew in 90 days as of 06/08/2025 new expiration date 09/06/2025 The contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Total Outstanding Activity Conditions - 3
Date Name
04/07/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
04/07/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/07/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0325-00420
Permit Description: Renew in 90 days as of 06/08/2025 new expiration date 09/06/2025 The contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/05/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/21/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/05/2025 TRSP - ROW - AERIAL INSTALLATION Passed
09/05/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
MAP TUCSON - ELM ST_V1.PDF DOCUMENTS VIEW
TCP_NEXT TUCSON BLVD - ELM ST_V1.PDF DOCUMENTS VIEW