Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0325-00408
Permit Details
Apply Date:
03/27/2025
Applicant:
ALICIA OROZCO
Description:
40 YRD ROLL OFF TO BE DELIVERED ON 04/18 AND REMOVED N 04/21 CORNER OF MILES AND MARTIN ACROSS FROM THIS ADDRESS
Permit Reviews
Permit Number - TR-ROW-0325-00408
Permit Status: Complete
Permit Description: 40 YRD ROLL OFF TO BE DELIVERED ON 04/18 AND REMOVED N 04/21 CORNER OF MILES AND MARTIN ACROSS FROM THIS ADDRESS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/03/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0325-00408
Permit Status: Complete
Permit Description: 40 YRD ROLL OFF TO BE DELIVERED ON 04/18 AND REMOVED N 04/21 CORNER OF MILES AND MARTIN ACROSS FROM THIS ADDRESS
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/03/2025 | 24 Hours with barricades at PODS REQUIRED AT ALL TIMES For Roll off (Big Trash Can in the Right Away) 1) Roll-offs or dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing stormdrain infrastructure. 2) Roll-offs or dumpsters shall keep lids on so that roll-off or dumpster is kept covered when not in use. Plugs shall be kept in place. 3) Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4) Damaged containers shall be reported for replacement. |
| 04/03/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0325-00408
Permit Description: 40 YRD ROLL OFF TO BE DELIVERED ON 04/18 AND REMOVED N 04/21 CORNER OF MILES AND MARTIN ACROSS FROM THIS ADDRESS
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/27/2025 | TRSP - ROW - Final | Passed |