Permit: TR-ROW-0325-00401
Permit Details
Apply Date:
03/27/2025
Applicant:
Armando Bracamonte
Description:
Renew in 90 days as of 06/08/2025 new expiration date 09/06/2025 The contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Permit Reviews
Permit Number - TR-ROW-0325-00401
Permit Status: Complete
Permit Description: Renew in 90 days as of 06/08/2025 new expiration date 09/06/2025
The contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/08/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0325-00401
Permit Status: Complete
Permit Description: Renew in 90 days as of 06/08/2025 new expiration date 09/06/2025
The contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/04/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/04/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/04/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/04/2025 | PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0325-00401
Permit Description: Renew in 90 days as of 06/08/2025 new expiration date 09/06/2025
The contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/08/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/08/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | Work is complete | |
| 09/08/2025 | TRSP - ROW - Final | Passed | Work is complete |