Description:
Located on the northwest corner of Catalina Park in the public right-of way between 1st Street curb and sidewalk, we will install three 13’-long x 7’ wide water-harvesting eddy basins. A rock rundown/one-rock dam hybrid will be placed on the upstream/inlet side of each basin, with the rundown slope not exceeding 2:1 slope. Inlet structure to extend from street curb to sidewalk, with the top of no rock higher than top of curb or sidewalk. Planting shelf will be placed on sidewalk side and outlet side of each basin. Each basin will get one 4"-diameter curb core on its upstream side. 3’ pedestrian platform along 1st Street will be maintained. Plant palette – all low-water-use Tucson Basin native plants. Trees (one per basin): Desert ironwood, 2 velvet mesquite Understory to include: desert hackberry, wolfberry, jojoba, desert honeysuckle, fairy duster, chuparosa, Mormon tea, sonoran janusia, arrowweed. For example of what basins and their rockwork will look like, see the basins across the street on the south side of 1st Street between 5th Avenue and Arizona Avenue. Catalina granite rock 8-18” size to be used for rock rundown/one-rock dam hybrid and stabilization of basin banks. Site and concept was inspected and approved by David Marhefka and Tucson Parks staff on March 4, 2025

Permit Reviews

Permit Number - TR-ROW-0325-00390
Permit Status: Complete
Permit Description: Located on the northwest corner of Catalina Park in the public right-of way between 1st Street curb and sidewalk, we will install three 13’-long x 7’ wide water-harvesting eddy basins. A rock rundown/one-rock dam hybrid will be placed on the upstream/inlet side of each basin, with the rundown slope not exceeding 2:1 slope. Inlet structure to extend from street curb to sidewalk, with the top of no rock higher than top of curb or sidewalk. Planting shelf will be placed on sidewalk side and outlet side of each basin. Each basin will get one 4"-diameter curb core on its upstream side. 3’ pedestrian platform along 1st Street will be maintained. Plant palette – all low-water-use Tucson Basin native plants. Trees (one per basin): Desert ironwood, 2 velvet mesquite Understory to include: desert hackberry, wolfberry, jojoba, desert honeysuckle, fairy duster, chuparosa, Mormon tea, sonoran janusia, arrowweed. For example of what basins and their rockwork will look like, see the basins across the street on the south side of 1st Street between 5th Avenue and Arizona Avenue. Catalina granite rock 8-18” size to be used for rock rundown/one-rock dam hybrid and stabilization of basin banks. Site and concept was inspected and approved by David Marhefka and Tucson Parks staff on March 4, 2025
Start Date Submittal Complete Date Status  
03/26/2025 RIGHT-OF-WAY REVIEW v.1 04/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0325-00390
Permit Status: Complete
Permit Description: Located on the northwest corner of Catalina Park in the public right-of way between 1st Street curb and sidewalk, we will install three 13’-long x 7’ wide water-harvesting eddy basins. A rock rundown/one-rock dam hybrid will be placed on the upstream/inlet side of each basin, with the rundown slope not exceeding 2:1 slope. Inlet structure to extend from street curb to sidewalk, with the top of no rock higher than top of curb or sidewalk. Planting shelf will be placed on sidewalk side and outlet side of each basin. Each basin will get one 4"-diameter curb core on its upstream side. 3’ pedestrian platform along 1st Street will be maintained. Plant palette – all low-water-use Tucson Basin native plants. Trees (one per basin): Desert ironwood, 2 velvet mesquite Understory to include: desert hackberry, wolfberry, jojoba, desert honeysuckle, fairy duster, chuparosa, Mormon tea, sonoran janusia, arrowweed. For example of what basins and their rockwork will look like, see the basins across the street on the south side of 1st Street between 5th Avenue and Arizona Avenue. Catalina granite rock 8-18” size to be used for rock rundown/one-rock dam hybrid and stabilization of basin banks. Site and concept was inspected and approved by David Marhefka and Tucson Parks staff on March 4, 2025
Total Outstanding Activity Conditions - 1
Date Name
04/02/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0325-00390
Permit Description: Located on the northwest corner of Catalina Park in the public right-of way between 1st Street curb and sidewalk, we will install three 13’-long x 7’ wide water-harvesting eddy basins. A rock rundown/one-rock dam hybrid will be placed on the upstream/inlet side of each basin, with the rundown slope not exceeding 2:1 slope. Inlet structure to extend from street curb to sidewalk, with the top of no rock higher than top of curb or sidewalk. Planting shelf will be placed on sidewalk side and outlet side of each basin. Each basin will get one 4"-diameter curb core on its upstream side. 3’ pedestrian platform along 1st Street will be maintained. Plant palette – all low-water-use Tucson Basin native plants. Trees (one per basin): Desert ironwood, 2 velvet mesquite Understory to include: desert hackberry, wolfberry, jojoba, desert honeysuckle, fairy duster, chuparosa, Mormon tea, sonoran janusia, arrowweed. For example of what basins and their rockwork will look like, see the basins across the street on the south side of 1st Street between 5th Avenue and Arizona Avenue. Catalina granite rock 8-18” size to be used for rock rundown/one-rock dam hybrid and stabilization of basin banks. Site and concept was inspected and approved by David Marhefka and Tucson Parks staff on March 4, 2025
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/21/2025 TRSP - ROW - Final Passed
05/15/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/15/2025 TRSP - ROW - Landscape Architect Passed

Documents