Permit: TR-ROW-0325-00374
Permit Details
Apply Date:
03/19/2025
Applicant:
Desert Barricade / Eric Horne
Description:
Dig and backfill sewer, install HCSS (one to each lot) and Ray Water Co. water service lines (not Tucson Water), remove and replace AC.
Permit Reviews
Permit Number - TR-ROW-0325-00374
Permit Status: Complete
Permit Description: Dig and backfill sewer, install HCSS (one to each lot) and Ray Water Co. water service lines (not Tucson Water), remove and replace AC.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/26/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0325-00374
Permit Status: Complete
Permit Description: Dig and backfill sewer, install HCSS (one to each lot) and Ray Water Co. water service lines (not Tucson Water), remove and replace AC.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/25/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/25/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0325-00374
Permit Description: Dig and backfill sewer, install HCSS (one to each lot) and Ray Water Co. water service lines (not Tucson Water), remove and replace AC.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Spoke with Shiloh from Strunk excavating. He stated that work would begin towards the end of this week or beginning of next week. | |
| 04/22/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/02/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 06/02/2025 | TRSP - ROW - Final | Passed | Work is complete, area is scheduled for resurfacing |