Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
5302 S MADISON SV
Apply Date:
03/19/2025
Applicant:
Desert Barricade / Eric Horne
Description:
Dig and backfill sewer, install HCSS (one to each lot) and Ray Water Co. water service lines (not Tucson Water), remove and replace AC.

Permit Reviews

Permit Number - TR-ROW-0325-00374
Permit Status: Complete
Permit Description: Dig and backfill sewer, install HCSS (one to each lot) and Ray Water Co. water service lines (not Tucson Water), remove and replace AC.
Start Date Submittal Complete Date Status  
03/21/2025 RIGHT-OF-WAY REVIEW v.1 03/26/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0325-00374
Permit Status: Complete
Permit Description: Dig and backfill sewer, install HCSS (one to each lot) and Ray Water Co. water service lines (not Tucson Water), remove and replace AC.
Total Outstanding Activity Conditions - 2
Date Name
03/25/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
03/25/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0325-00374
Permit Description: Dig and backfill sewer, install HCSS (one to each lot) and Ray Water Co. water service lines (not Tucson Water), remove and replace AC.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/15/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Spoke with Shiloh from Strunk excavating. He stated that work would begin towards the end of this week or beginning of next week.
04/22/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/02/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
06/02/2025 TRSP - ROW - Final Passed Work is complete, area is scheduled for resurfacing

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DB 68185 - PAGE 1 - 5310 S MADISON STAV - HARD CLOSURE - ROCA REALTY_V1.PDF DOCUMENTS VIEW
HCS DESIGN FOR LOTS 1 - 3 MADISON STRAVENUE 3.12.2520250313100617(1) (1)_V1.PDF DOCUMENTS VIEW