Permit: TR-ROW-0325-00373
Permit Details
Apply Date:
03/19/2025
Applicant:
Joanne Schmidt
Description:
Temporary work where property line meets ROW line, to repair a damaged residential sewer line. Excavation and repair of line is primary scope of work
Permit Reviews
Permit Number - TR-ROW-0325-00373
Permit Status: Complete
Permit Description: Temporary work where property line meets ROW line, to repair a damaged residential sewer line. Excavation and repair of line is primary scope of work
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0325-00373
Permit Status: Complete
Permit Description: Temporary work where property line meets ROW line, to repair a damaged residential sewer line. Excavation and repair of line is primary scope of work
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/25/2025 | NO LANES OF TRAFFIC ON PIMA ST WILL BE AFFECTED. |
| 03/25/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 03/25/2025 | Pre-activity meeting to be held 72 hours in advance of work start with inspections. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 03/27/2025 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0325-00373
Permit Description: Temporary work where property line meets ROW line, to repair a damaged residential sewer line. Excavation and repair of line is primary scope of work
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/28/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/28/2025 | TRSP - ROW - Final | Passed |