Permit: TR-ROW-0325-00364
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
7560 E CAMINO DEL RIO
Address NEW:
7560 E CAMINO DEL RIO
Apply Date:
03/18/2025
Applicant:
Adam Ortega
Description:
Sidewalk repair; right of way permit
Permit Reviews
Permit Number - TR-ROW-0325-00364
Permit Status: Complete
Permit Description: Sidewalk repair; right of way permit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0325-00364
Permit Status: Complete
Permit Description: Sidewalk repair; right of way permit
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/25/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 03/25/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 03/25/2025 | Pre-activity meeting to be held 72 hours in advance of work start with inspections. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 03/25/2025 | REPLACE/REPAIR APPROXIMATELY TWO (2) SIDEWALK PANELS PER PAG STANDARD DETAIL 200. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0325-00364
Permite Description: Sidewalk repair; right of way permit
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | TRSP - ROW - Final | N/A | Failed | |
| 04/28/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Failed |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0325-00364
Permit Description: Sidewalk repair; right of way permit
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/28/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 04/06/2026 | TRSP - ROW - Final | Passed | ||
| 04/06/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed |