Permit: TR-ROW-0325-00359
Permit Details
Apply Date:
03/17/2025
Applicant:
Adam Bishop
Description:
03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb) 5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting 6th St - From Campbell to Country Club Incl Intersection 5th St - From Country Club to Wilmot Incl Intersections Revisions to conditions 04/19/2025: 1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm 2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement. 3. Utilizing Guapo Way as a staging area 06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction. 07/13/202 - Request for 90 Day Renewal as of 08/12/2026
Permit Reviews
Permit Number - TR-ROW-0325-00359
Permit Status: Issued
Permit Description: 03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb)
5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting
6th St - From Campbell to Country Club Incl Intersection
5th St - From Country Club to Wilmot Incl Intersections
Revisions to conditions 04/19/2025:
1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm
2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement.
3. Utilizing Guapo Way as a staging area
06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction.
07/13/202 - Request for 90 Day Renewal as of 08/12/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 06/02/2025 | APPROVED |
| 03/19/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0325-00359
Permit Status: Issued
Permit Description: 03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb)
5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting
6th St - From Campbell to Country Club Incl Intersection
5th St - From Country Club to Wilmot Incl Intersections
Revisions to conditions 04/19/2025:
1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm
2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement.
3. Utilizing Guapo Way as a staging area
06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction.
07/13/202 - Request for 90 Day Renewal as of 08/12/2026
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/19/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/19/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/09/2025 | The following extended traffic control set-up times were approved: |
| 04/09/2025 | Temporary Pavement Patch |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ROW-0325-00359
Permite Description: 03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb)
5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting
6th St - From Campbell to Country Club Incl Intersection
5th St - From Country Club to Wilmot Incl Intersections
Revisions to conditions 04/19/2025:
1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm
2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement.
3. Utilizing Guapo Way as a staging area
06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction.
07/13/202 - Request for 90 Day Renewal as of 08/12/2026
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Partial Pass |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0325-00359
Permit Description: 03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb)
5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting
6th St - From Campbell to Country Club Incl Intersection
5th St - From Country Club to Wilmot Incl Intersections
Revisions to conditions 04/19/2025:
1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm
2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement.
3. Utilizing Guapo Way as a staging area
06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction.
07/13/202 - Request for 90 Day Renewal as of 08/12/2026
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |