Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Address:
3185 E 5TH ST
Address NEW:
3185 E 5TH ST
Apply Date:
03/17/2025
Applicant:
Adam Bishop
Description:
03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb) 5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting 6th St - From Campbell to Country Club Incl Intersection 5th St - From Country Club to Wilmot Incl Intersections Revisions to conditions 04/19/2025: 1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm 2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement. 3. Utilizing Guapo Way as a staging area 06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction. 07/13/202 - Request for 90 Day Renewal as of 08/12/2026

Permit Reviews

Permit Number - TR-ROW-0325-00359
Permit Status: Issued
Permit Description: 03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb) 5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting 6th St - From Campbell to Country Club Incl Intersection 5th St - From Country Club to Wilmot Incl Intersections Revisions to conditions 04/19/2025: 1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm 2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement. 3. Utilizing Guapo Way as a staging area 06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction. 07/13/202 - Request for 90 Day Renewal as of 08/12/2026
Start Date Submittal Complete Date Status  
04/23/2025 RIGHT-OF-WAY REVIEW REVISION v.1 06/02/2025 APPROVED Review Details
03/19/2025 RIGHT-OF-WAY REVIEW v.1 03/20/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0325-00359
Permit Status: Issued
Permit Description: 03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb) 5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting 6th St - From Campbell to Country Club Incl Intersection 5th St - From Country Club to Wilmot Incl Intersections Revisions to conditions 04/19/2025: 1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm 2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement. 3. Utilizing Guapo Way as a staging area 06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction. 07/13/202 - Request for 90 Day Renewal as of 08/12/2026
Total Outstanding Activity Conditions - 4
Date Name
03/19/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
03/19/2025 Traffic control set-up approved between 9AM - 3:30PM
04/09/2025 The following extended traffic control set-up times were approved:
04/09/2025 Temporary Pavement Patch

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-ROW-0325-00359
Permite Description: 03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb) 5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting 6th St - From Campbell to Country Club Incl Intersection 5th St - From Country Club to Wilmot Incl Intersections Revisions to conditions 04/19/2025: 1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm 2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement. 3. Utilizing Guapo Way as a staging area 06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction. 07/13/202 - Request for 90 Day Renewal as of 08/12/2026
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/03/2026 TRSP - ROW - Barricade - Setup/Routine N/A Partial Pass

Completed Inspections

Permit Status: Issued
Permit Number: TR-ROW-0325-00359
Permit Description: 03/06/26- renew for 30 days as of 04/14/26 new expiration date 05/14/26(ieb) 5th St Reconstruction Project - Waterline Replacement, Roadway Reconstruction, Sidewalk, Street Lighting 6th St - From Campbell to Country Club Incl Intersection 5th St - From Country Club to Wilmot Incl Intersections Revisions to conditions 04/19/2025: 1. Traffic control revised to 24/7 traffic control set-up instead of 9am-3:30pm 2. Temporary pavement patch revised to allow (3" AC). Pavement reconstruction to follow waterline replacement. 3. Utilizing Guapo Way as a staging area 06/01/2025: Revised Traffic Control Plan for the south side of Phase 1 of construction. 07/13/202 - Request for 90 Day Renewal as of 08/12/2026
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/10/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
HUNTER - 5TH STREET - SHIFT - HARD CL AT DODGE PLAN 6 - PHASE 1.1.5. APPROVED.PDF DOCUMENTS VIEW
SWAN JACK AND BORE TCP APPROVED.PDF DOCUMENTS VIEW
5TH_ST_WALKABILITY-SUBMITTAL1-REV-0-TRAFFIC_CONTROL_PLAN_-_CAMPBELL-202505272310_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
HUNT9771_V1.PDF DOCUMENTS VIEW
1.1.1 - HUNTER - 5TH STREET - SHIFT TO SOUTH PLAN_V1.PDF DOCUMENTS VIEW
1.1.2 - HUNTER - 5TH STREET - SHIFT TO SOUTH PLAN_V1.PDF DOCUMENTS VIEW
1.1.3 - HUNTER - 5TH STREET - SHIFT TO SOUTH PLAN_V1.PDF DOCUMENTS VIEW
1.1.4 - HUNTER - 5TH STREET - SHIFT TO SOUTH AT DODGE PLAN_V1.PDF DOCUMENTS VIEW
1.1.5 - HUNTER - 5TH STREET - SHIFT HARD CL AT DODGE PLAN_V1.PDF DOCUMENTS VIEW
1.1.7 HUNTER - 5TH STREET - FOOTBALL SHIFT TO SOUTH AT DODGE PLAN_V1.PDF DOCUMENTS VIEW
1.1.8 - HUNTER - 5TH STREET - SHIFT TO SOUTH AT PALO VERDE PLAN_V1.PDF DOCUMENTS VIEW
1.2.1 - HUNTER - 5TH STREET (ALVERNON INTERSECTION) - SHIFT TO NORTH WEST PLAN_V1.PDF DOCUMENTS VIEW
1.2.2 - HUNTER - 5TH STREET (ALVERNON INTERSECTION) - SHIFT TO NORTH EAST PLAN_V1.PDF DOCUMENTS VIEW
1.2.3 - HUNTER - 5TH STREET (ALVERNON INTERSECTION) - SHIFT TO SOUTH NB RLC PLAN 3B_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P25PW00015_PLANS - FINAL_V1.PDF DOCUMENTS VIEW
SITE PLAN_V1.PDF DOCUMENTS VIEW