Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW)
Apply Date:
03/17/2025
Applicant:
Arthur Mehler
Description:
AZTEC will perform 29 potholes on Fairview Rd between Miracle Mile and Grant Rd. A distance of 3900 feet.

Permit Reviews

Permit Number - TR-ROW-0325-00351
Permit Status: Fees due
Permit Description: AZTEC will perform 29 potholes on Fairview Rd between Miracle Mile and Grant Rd. A distance of 3900 feet.
Start Date Submittal Complete Date Status  
04/07/2025 RIGHT-OF-WAY REVIEW v.2 04/08/2025 APPROVED Review Details
03/17/2025 RIGHT-OF-WAY REVIEW v.1 03/21/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0325-00351
Permit Status: Fees due
Permit Description: AZTEC will perform 29 potholes on Fairview Rd between Miracle Mile and Grant Rd. A distance of 3900 feet.
Total Outstanding Activity Conditions - 4
Date Name
03/20/2025 Traffic control set-up approved between 9AM - 3:30PM
03/20/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
04/08/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE.
04/08/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Documents

File Name Document Type  
BINDER1_V2.PDF DOCUMENTS VIEW
C-FAIRVIEW-GRANT TO MIRACLE MILE-PH_V2.PDF DOCUMENTS VIEW