Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
03/14/2025
Applicant:
Arthur Mehler
Description:
AZTEC will perform 17 utility potholes for Tucson Water between Wetmore Rd and Simons Rd. A distance of 4100 feet.

Permit Reviews

Permit Number - TR-ROW-0325-00344
Permit Status: Complete
Permit Description: AZTEC will perform 17 utility potholes for Tucson Water between Wetmore Rd and Simons Rd. A distance of 4100 feet.
Start Date Submittal Complete Date Status  
03/26/2025 RIGHT-OF-WAY REVIEW v.2 03/27/2025 REQUIRES RESUBMIT Review Details
05/09/2025 RIGHT-OF-WAY REVIEW v.3 05/09/2025 APPROVED Review Details
03/14/2025 RIGHT-OF-WAY REVIEW v.1 03/20/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0325-00344
Permit Status: Complete
Permit Description: AZTEC will perform 17 utility potholes for Tucson Water between Wetmore Rd and Simons Rd. A distance of 4100 feet.
Total Outstanding Activity Conditions - 3
Date Name
03/19/2025 Traffic control set-up approved between 9AM - 3:30PM
03/19/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
03/19/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0325-00344
Permit Description: AZTEC will perform 17 utility potholes for Tucson Water between Wetmore Rd and Simons Rd. A distance of 4100 feet.
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/30/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/11/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/11/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
06/11/2025 TRSP - ROW - Barricade Takedown Passed
06/11/2025 TRSP - ROW - Final Passed