Permit: TR-ROW-0325-00317
Permit Details
Apply Date:
03/06/2025
Applicant:
Desert Barricade / Eric Horne
Description:
CONCRETE FLAT WORK/ ASPHALT APRON TIE IN (Updated 4/4/25 - Approved for 24hr Right lane Closures for Pedestrain detour pathway)
Permit Reviews
Permit Number - TR-ROW-0325-00317
Permit Status: Complete
Permit Description: CONCRETE FLAT WORK/ ASPHALT APRON TIE IN (Updated 4/4/25 - Approved for 24hr Right lane Closures for Pedestrain detour pathway)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/10/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0325-00317
Permit Status: Complete
Permit Description: CONCRETE FLAT WORK/ ASPHALT APRON TIE IN (Updated 4/4/25 - Approved for 24hr Right lane Closures for Pedestrain detour pathway)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/07/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/07/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 03/10/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE |
| 03/10/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0325-00317
Permit Description: CONCRETE FLAT WORK/ ASPHALT APRON TIE IN (Updated 4/4/25 - Approved for 24hr Right lane Closures for Pedestrain detour pathway)
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/07/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/16/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 04/16/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 04/16/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 04/18/2025 | TRSP - ROW - Final | Passed |