Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
2149 S ALVERNON WY
Apply Date:
03/04/2025
Applicant:
James Redding
Description:
Installation of underground conduit pathway to accommodate TEP's request to bypass 2 poles of the aerial pathway.

Permit Reviews

Permit Number - TR-ROW-0325-00307
Permit Status: Complete
Permit Description: Installation of underground conduit pathway to accommodate TEP's request to bypass 2 poles of the aerial pathway.
Start Date Submittal Complete Date Status  
03/06/2025 RIGHT-OF-WAY REVIEW v.1 03/11/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0325-00307
Permit Status: Complete
Permit Description: Installation of underground conduit pathway to accommodate TEP's request to bypass 2 poles of the aerial pathway.
Total Outstanding Activity Conditions - 3
Date Name
03/07/2025 ROW Permit is only allowed for work within City of Tucson Right of Way.
03/07/2025 Traffic control set-up approved between 9AM - 3:30PM
03/07/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0325-00307
Permit Description: Installation of underground conduit pathway to accommodate TEP's request to bypass 2 poles of the aerial pathway.
Total Completed Inspections - 6
Date Description Inspector Results Comments
03/27/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed On-site meeting with Robert with Sturgeon and Ivan with Diamond Ditch. Work to begin today 3/27/25 and should wrap up around Monday or Tuesday of next week.
06/13/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is now complete and traffic control has been removed. This inspection is no longer needed.
06/13/2025 TRSP - ROW - Barricade Takedown Passed Work is complete
06/13/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
06/13/2025 TRSP - ROW - AERIAL INSTALLATION Passed The work consisted of underground not overhead therefore, this inspection was not needed
06/13/2025 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW