Permit: TR-ROW-0325-00307
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2149 S ALVERNON WY
Address NEW:
2149 S ALVERNON WY
Apply Date:
03/04/2025
Applicant:
James Redding
Description:
Installation of underground conduit pathway to accommodate TEP's request to bypass 2 poles of the aerial pathway.
Permit Reviews
Permit Number - TR-ROW-0325-00307
Permit Status: Complete
Permit Description: Installation of underground conduit pathway to accommodate TEP's request to bypass 2 poles of the aerial pathway.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0325-00307
Permit Status: Complete
Permit Description: Installation of underground conduit pathway to accommodate TEP's request to bypass 2 poles of the aerial pathway.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/07/2025 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 03/07/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/07/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0325-00307
Permit Description: Installation of underground conduit pathway to accommodate TEP's request to bypass 2 poles of the aerial pathway.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | On-site meeting with Robert with Sturgeon and Ivan with Diamond Ditch. Work to begin today 3/27/25 and should wrap up around Monday or Tuesday of next week. | |
| 06/13/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is now complete and traffic control has been removed. This inspection is no longer needed. | |
| 06/13/2025 | TRSP - ROW - Barricade Takedown | Passed | Work is complete | |
| 06/13/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 06/13/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | The work consisted of underground not overhead therefore, this inspection was not needed | |
| 06/13/2025 | TRSP - ROW - Final | Passed | Work is complete |