Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
03/27/2024
Applicant:
Dan Padilla
Description:
ROW Permit for air-vacuum excavation of 4 off road utility potholes approximately 12"x12" in size for the design phase of Swan Rd: Multi-Use Pathway-Valencia Rd to Fairy Duster Dr Project

Permit Reviews

Permit Number - TR-ROW-0324-00343
Permit Status: Complete
Permit Description: ROW Permit for air-vacuum excavation of 4 off road utility potholes approximately 12"x12" in size for the design phase of Swan Rd: Multi-Use Pathway-Valencia Rd to Fairy Duster Dr Project
Start Date Submittal Complete Date Status  
03/27/2024 RIGHT-OF-WAY REVIEW v.1 04/01/2024 REQUIRES RESUBMIT Review Details
04/02/2024 RIGHT-OF-WAY REVIEW v.2 04/23/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0324-00343
Permit Status: Complete
Permit Description: ROW Permit for air-vacuum excavation of 4 off road utility potholes approximately 12"x12" in size for the design phase of Swan Rd: Multi-Use Pathway-Valencia Rd to Fairy Duster Dr Project
Total Outstanding Activity Conditions - 2
Date Name
04/03/2024 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
04/03/2024 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0324-00343
Permit Description: ROW Permit for air-vacuum excavation of 4 off road utility potholes approximately 12"x12" in size for the design phase of Swan Rd: Multi-Use Pathway-Valencia Rd to Fairy Duster Dr Project
Total Completed Inspections - 6
Date Description Inspector Results Comments
05/06/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed precon held over phone. site is ready for work to begin
05/23/2024 TRSP - ROW - Barricade - Setup/Routine Passed site completed
05/23/2024 TRSP - ROW - Barricade Takedown Passed
05/23/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
05/23/2024 TRSP - ROW - Final/Close-Out Passed
08/27/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed Zach Staten: Paving not needed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
SWAN ROAD MUP POTHOLE REQUEST_V1.PDF DOCUMENTS VIEW