Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0324-00341
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3139 E BELLEVUE ST
Address NEW:
3139 E BELLEVUE ST
Apply Date:
03/27/2024
Applicant:
Ginger Schaad
Description:
Apron and sidewalk
Permit Reviews
Permit Number - TR-ROW-0324-00341
Permit Status: Complete
Permit Description: Apron and sidewalk
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0324-00341
Permit Status: Complete
Permit Description: Apron and sidewalk
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/27/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 03/27/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/27/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0324-00341
Permite Description: Apron and sidewalk
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0324-00341
Permit Description: Apron and sidewalk
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/10/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/17/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 05/31/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/26/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 06/26/2024 | TRSP - ROW - Final/Close-Out | Passed |