Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0324-00340
Permit Details
Apply Date:
03/26/2024
Applicant:
Austin Wesnitzer
Description:
Perform a geotechnical investigation that includes 2 borings in City of Tucson Right-of-Way in support of the proposed segmental bridge over the Union Pacific Railroad and Aviation Parkway (part of COT project, 22nd Street: Kino Parkway to Tucson Boulevard, Plan No. 1-2010-012).
Permit Reviews
Permit Number - TR-ROW-0324-00340
Permit Status: Complete
Permit Description: Perform a geotechnical investigation that includes 2 borings in City of Tucson Right-of-Way in support of the proposed segmental bridge over the Union Pacific Railroad and Aviation Parkway (part of COT project, 22nd Street: Kino Parkway to Tucson Boulevard, Plan No. 1-2010-012).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0324-00340
Permit Status: Complete
Permit Description: Perform a geotechnical investigation that includes 2 borings in City of Tucson Right-of-Way in support of the proposed segmental bridge over the Union Pacific Railroad and Aviation Parkway (part of COT project, 22nd Street: Kino Parkway to Tucson Boulevard, Plan No. 1-2010-012).
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/27/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0324-00340
Permit Description: Perform a geotechnical investigation that includes 2 borings in City of Tucson Right-of-Way in support of the proposed segmental bridge over the Union Pacific Railroad and Aviation Parkway (part of COT project, 22nd Street: Kino Parkway to Tucson Boulevard, Plan No. 1-2010-012).
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/21/2024 | TRSP - ROW - Final/Close-Out | Passed |