Permit: TR-ROW-0324-00332
Permit Details
Apply Date:
03/25/2024
Applicant:
Alex Pratt
Description:
Remove and replace asphalt on private property.***
Permit Reviews
Permit Number - TR-ROW-0324-00332
Permit Status: Complete
Permit Description: Remove and replace asphalt on private property.***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0324-00332
Permit Status: Complete
Permit Description: Remove and replace asphalt on private property.***
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/25/2024 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 03/25/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/25/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0324-00332
Permite Description: Remove and replace asphalt on private property.***
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Partial Pass | |
| 05/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Partial Pass | |
| 05/10/2024 | TRSP - ROW - Barricade Takedown | N/A | Partial Pass | |
| 05/10/2024 | TRSP - ROW - Final/Close-Out | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0324-00332
Permit Description: Remove and replace asphalt on private property.***
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/10/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 09/10/2025 | TRSP - ROW - Final/Close-Out | Passed |