Permit: TR-ROW-0324-00272
Permit Details
Apply Date:
03/08/2024
Applicant:
Cameron Bonner
Description:
323058 Site 3 - (continuation of permit TR-ROW-0324-00271) Install Approximately 270 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Bench rehab and concrete collar will be completed on MH 9859-19 per PCRWRD standard detail 212.
Permit Reviews
Permit Number - TR-ROW-0324-00272
Permit Status: Complete
Permit Description: 323058 Site 3 - (continuation of permit TR-ROW-0324-00271) Install Approximately 270 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Bench rehab and concrete collar will be completed on MH 9859-19 per PCRWRD standard
detail 212.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0324-00272
Permit Status: Complete
Permit Description: 323058 Site 3 - (continuation of permit TR-ROW-0324-00271) Install Approximately 270 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Bench rehab and concrete collar will be completed on MH 9859-19 per PCRWRD standard
detail 212.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/12/2024 | Bus stop/ route |
| 03/12/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0324-00272
Permit Description: 323058 Site 3 - (continuation of permit TR-ROW-0324-00271) Install Approximately 270 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Bench rehab and concrete collar will be completed on MH 9859-19 per PCRWRD standard
detail 212.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/18/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/18/2024 | TRSP - ROW - Notice of Completion | Passed |