Permit: TR-ROW-0324-00244
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
7411 E DESERT PALM DR
Address NEW:
7411 E DESERT PALM DR
Apply Date:
03/01/2024
Applicant:
Cameron Bonner
Description:
323057 Site 2 - Install Approximately 103 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. In order to install the CIPP EMC will need to remove cleanout 7263*05 and install a new terminal manhole in its place. A bench rehab will be completed on MH 8737-08.
Permit Reviews
Permit Number - TR-ROW-0324-00244
Permit Status: Complete
Permit Description: 323057 Site 2 - Install Approximately 103 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. In order to install the CIPP EMC will need to remove cleanout 7263*05 and install a new terminal manhole in its place. A bench rehab will be completed on MH 8737-08.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0324-00244
Permit Status: Complete
Permit Description: 323057 Site 2 - Install Approximately 103 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. In order to install the CIPP EMC will need to remove cleanout 7263*05 and install a new terminal manhole in its place. A bench rehab will be completed on MH 8737-08.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/04/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0324-00244
Permit Description: 323057 Site 2 - Install Approximately 103 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. In order to install the CIPP EMC will need to remove cleanout 7263*05 and install a new terminal manhole in its place. A bench rehab will be completed on MH 8737-08.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/15/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/15/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 04/15/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 04/15/2024 | TRSP - ROW - Notice of Completion | Passed |