Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
9305 S WILMOT RD
Address NEW:
9305 S WILMOT RD
Apply Date:
03/31/2023
Applicant:
Brad Farkas
Description:
Crew will be boring 2.5" pipe underneath S Wilmot Road from the east side to the west side of the road toward the over head utility poles . Prior to boring, pot holing will need to be completed to locate depths of under ground utilities. Pot holing will need to take place in Turning lane on S. Wilmot approximately 1 mile south of E Klafter. The turning lane for the Penitentiary. We are requesting a shadow truck from Trafficade.

Permit Reviews

Permit Number - TR-ROW-0323-00584
Permit Status: Complete
Permit Description: Crew will be boring 2.5" pipe underneath S Wilmot Road from the east side to the west side of the road toward the over head utility poles . Prior to boring, pot holing will need to be completed to locate depths of under ground utilities. Pot holing will need to take place in Turning lane on S. Wilmot approximately 1 mile south of E Klafter. The turning lane for the Penitentiary. We are requesting a shadow truck from Trafficade.
Start Date Submittal Complete Date Status  
04/24/2023 RIGHT-OF-WAY REVIEW v.2 04/24/2023 APPROVED Review Details
04/02/2023 RIGHT-OF-WAY REVIEW v.1 04/12/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0323-00584
Permit Status: Complete
Permit Description: Crew will be boring 2.5" pipe underneath S Wilmot Road from the east side to the west side of the road toward the over head utility poles . Prior to boring, pot holing will need to be completed to locate depths of under ground utilities. Pot holing will need to take place in Turning lane on S. Wilmot approximately 1 mile south of E Klafter. The turning lane for the Penitentiary. We are requesting a shadow truck from Trafficade.
Total Outstanding Activity Conditions - 1
Date Name
04/24/2023 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0323-00584
Permit Description: Crew will be boring 2.5" pipe underneath S Wilmot Road from the east side to the west side of the road toward the over head utility poles . Prior to boring, pot holing will need to be completed to locate depths of under ground utilities. Pot holing will need to take place in Turning lane on S. Wilmot approximately 1 mile south of E Klafter. The turning lane for the Penitentiary. We are requesting a shadow truck from Trafficade.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/25/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/25/2023 TRSP - ROW - Field Change Request Passed
09/25/2023 TRSP - ROW - Recurring Passed
09/25/2023 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
LOOKOUT TRAFFIC CONTROL PLAN_V1_APPROVED.PDF DOCUMENTS VIEW