Permit: TR-ROW-0323-00566
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1900 N WESTRIDGE AV
Address NEW:
1900 N WESTRIDGE AV
Apply Date:
03/29/2023
Applicant:
Andrew Ruiz
Description:
Install 190 LF of CIPP.
Permit Reviews
Permit Number - TR-ROW-0323-00566
Permit Status: Complete
Permit Description: Install 190 LF of CIPP.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/02/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/10/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-0323-00566
Permit Status: Complete
Permit Description: Install 190 LF of CIPP.
| Date | Description | Comments |
|---|---|---|
| 04/10/2023 | ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL * * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 04/10/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0323-00566
Permite Description: Install 190 LF of CIPP.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | Pre-con with Geoff Tucker from Achen Gardner went over permit details and Traffic Control. |
| 04/18/2023 | TRSP - ROW - Recurring | N/A | Re-inspection required | No activity |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0323-00566
Permit Description: Install 190 LF of CIPP.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2023 | TRSP - ROW - Notice of Completion | Passed |