Permit: TR-ROW-0323-00462
Permit Details
Apply Date:
03/07/2023
Applicant:
Cameron Bonner
Description:
Site 2 - Remove and replace cleanout 8513*09 with a terminal manhole per PC Std Dtl 201 and 205. Install Approximately 207LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth.
Permit Reviews
Permit Number - TR-ROW-0323-00462
Permit Status: Complete
Permit Description: Site 2 - Remove and replace cleanout 8513*09 with a terminal manhole per PC Std Dtl 201 and 205. Install Approximately 207LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/09/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/05/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0323-00462
Permit Status: Complete
Permit Description: Site 2 - Remove and replace cleanout 8513*09 with a terminal manhole per PC Std Dtl 201 and 205. Install Approximately 207LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/28/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0323-00462
Permite Description: Site 2 - Remove and replace cleanout 8513*09 with a terminal manhole per PC Std Dtl 201 and 205. Install Approximately 207LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2023 | TRSP - ROW - Recurring | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0323-00462
Permit Description: Site 2 - Remove and replace cleanout 8513*09 with a terminal manhole per PC Std Dtl 201 and 205. Install Approximately 207LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/14/2023 | TRSP - ROW - Final/Close-Out | Passed |