Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4910 N 1ST AV
Address NEW:
4910 N 1ST AV
Apply Date:
02/26/2026
Applicant:
Andrew Ruiz
Description:
Replacing 16 LF of displaced curb and 35 SY of affected asphalt on the NE Corner of 1st and River intersection. Duration: 3 days. Owner: Eric Ross, COT DTM.

Permit Reviews

Permit Number - TR-ROW-0226-00239
Permit Status: Complete
Permit Description: Replacing 16 LF of displaced curb and 35 SY of affected asphalt on the NE Corner of 1st and River intersection. Duration: 3 days. Owner: Eric Ross, COT DTM.
Start Date Submittal Complete Date Status  
02/26/2026 RIGHT-OF-WAY REVIEW v.1 03/09/2026 REQUIRES RESUBMIT Review Details
03/11/2026 RIGHT-OF-WAY REVIEW v.2 03/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0226-00239
Permit Status: Complete
Permit Description: Replacing 16 LF of displaced curb and 35 SY of affected asphalt on the NE Corner of 1st and River intersection. Duration: 3 days. Owner: Eric Ross, COT DTM.
Total Outstanding Activity Conditions - 5
Date Name
03/02/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
03/06/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
03/06/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
03/06/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
03/13/2026 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0226-00239
Permit Description: Replacing 16 LF of displaced curb and 35 SY of affected asphalt on the NE Corner of 1st and River intersection. Duration: 3 days. Owner: Eric Ross, COT DTM.
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/27/2026 TRSP - ROW - AERIAL INSTALLATION Passed This is not an aerial inspection. They had to replace curb and gutter and asphalt. This was a jock project that became urgent with streets KE an G did the curb and gutter replacement and asphalt replacement streets had got this repair with urgency. They're sending me documents to upload to the permit for verifying they use the proper materials. Per standard. Barricades today will be removed.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
KE-G10292_V2.PDF DOCUMENTS VIEW
SITE PLAN 2_V2.PDF DOCUMENTS VIEW