Permit: TR-ROW-0226-00237
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
302 N GRANADA AV
Address NEW:
302 N GRANADA AV
Apply Date:
02/26/2026
Applicant:
ANGEL MORALES
Description:
CIPP sewer
Permit Reviews
Permit Number - TR-ROW-0226-00237
Permit Status: Inspections
Permit Description: CIPP sewer
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/09/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/11/2026 | REQUIRES RESUBMIT |
| 02/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/06/2026 | REQUIRES RESUBMIT |
| 03/12/2026 | RIGHT-OF-WAY REVIEW v.3 | 03/13/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0226-00237
Permit Status: Inspections
Permit Description: CIPP sewer
Total Outstanding Activity Conditions - 10
| Date | Name |
|---|---|
| 03/03/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 03/03/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/04/2026 | Granada Av is under a pavement moratorium. Any disturbance of existing asphalt shall require a 2-inch mill and overlay for a minimum of 25 feet in each direction from the outside edge of the cut, across all affected travel lanes |
| 03/04/2026 | W Franklin St is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting. |
| 03/11/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 03/11/2026 | If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
| 03/13/2026 | Approved for the setup and take down times of 8pm to 5am |
| 03/13/2026 | Bus Stop - Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 03/13/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 03/13/2026 | Temporary Noise Exemption Required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0226-00237
Permit Description: CIPP sewer
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |