Permit: TR-ROW-0226-00231
Permit Details
Apply Date:
02/25/2026
Applicant:
David Marhefka
Description:
The S Belvedere Ave Green Corridor Project is located within the right-of-way on the west side of S. Belvedere Ave, east of the residences of 4466 E Sylvane St, 4465 E 28th St, and 4466 E 28th St in the south Naylor neighborhood. The project will convert three previously unused areas into small native ecosystems. Our work involves excavating stormwater harvesting basins and installing rockwork & boulders.
Permit Reviews
Permit Number - TR-ROW-0226-00231
Permit Status: Complete
Permit Description: The S Belvedere Ave Green Corridor Project is located within the right-of-way on the west side
of S. Belvedere Ave, east of the residences of 4466 E Sylvane St, 4465 E 28th St, and 4466 E
28th St in the south Naylor neighborhood. The project will convert three previously unused
areas into small native ecosystems. Our work involves excavating stormwater harvesting basins and installing rockwork & boulders.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/25/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0226-00231
Permit Status: Complete
Permit Description: The S Belvedere Ave Green Corridor Project is located within the right-of-way on the west side
of S. Belvedere Ave, east of the residences of 4466 E Sylvane St, 4465 E 28th St, and 4466 E
28th St in the south Naylor neighborhood. The project will convert three previously unused
areas into small native ecosystems. Our work involves excavating stormwater harvesting basins and installing rockwork & boulders.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/26/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 02/26/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0226-00231
Permit Description: The S Belvedere Ave Green Corridor Project is located within the right-of-way on the west side
of S. Belvedere Ave, east of the residences of 4466 E Sylvane St, 4465 E 28th St, and 4466 E
28th St in the south Naylor neighborhood. The project will convert three previously unused
areas into small native ecosystems. Our work involves excavating stormwater harvesting basins and installing rockwork & boulders.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Site is ready for work to begin, no sidewalks in the area and minimal impact to pavement. | |
| 03/03/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Traffic control is set up according to the approved TCP. | |
| 03/06/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 03/09/2026 | TRSP - ROW - Final | Passed | Work is complete |