Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Right-of-Way (ROW)
Address:
5902 E 23RD ST
Address NEW:
5902 E 23RD ST
Apply Date:
02/24/2026
Applicant:
Desert Barricade / Eric Horne
Description:
Application is for utility work involving a contractor who will be performing maintenance and repairs on water pipes within various locations throughout the neighborhood. The work will be concentrated in residential areas. 03/27/26- Revise plans where submitted for water line. 06/02/26- Renew permit for 90 days as of 06/02/26 new expiration date is 08/31/26.

Permit Reviews

Permit Number - TR-ROW-0226-00221
Permit Status: Inspections complete
Permit Description: Application is for utility work involving a contractor who will be performing maintenance and repairs on water pipes within various locations throughout the neighborhood. The work will be concentrated in residential areas. 03/27/26- Revise plans where submitted for water line. 06/02/26- Renew permit for 90 days as of 06/02/26 new expiration date is 08/31/26.
Start Date Submittal Complete Date Status  
03/24/2026 RIGHT-OF-WAY REVIEW REVISION v.1 N/A APPROVED Review Details
02/24/2026 RIGHT-OF-WAY REVIEW v.1 02/27/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0226-00221
Permit Status: Inspections complete
Permit Description: Application is for utility work involving a contractor who will be performing maintenance and repairs on water pipes within various locations throughout the neighborhood. The work will be concentrated in residential areas. 03/27/26- Revise plans where submitted for water line. 06/02/26- Renew permit for 90 days as of 06/02/26 new expiration date is 08/31/26.
Total Outstanding Activity Conditions - 6
Date Name
02/25/2026 PRE-CON/SIDEWALK
02/25/2026 Traffic Control set-up approved between 7AM - 5PM
02/25/2026 Traffic control set-up approved between 9AM - 3:30PM
02/25/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
02/27/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
02/27/2026 If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103)

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TR-ROW-0226-00221
Permite Description: Application is for utility work involving a contractor who will be performing maintenance and repairs on water pipes within various locations throughout the neighborhood. The work will be concentrated in residential areas. 03/27/26- Revise plans where submitted for water line. 06/02/26- Renew permit for 90 days as of 06/02/26 new expiration date is 08/31/26.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/02/2026 TRSP - ROW - SITE INSPECTION N/A Not Ready phone call with Shi, job has not yet started. Permit expires today and extension still needs to be submitted.
06/26/2026 TRSP - ROW - Barricade - Setup/Routine N/A Complete (Recurring) first section setup with advanced warnings and saw cuts on Edlin
06/02/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Not Ready phone call with Shi, job has not yet started. Permit expires today and extension still needs to be submitted.
06/02/2026 TRSP - ROW - Final N/A Not Ready phone call with Shi, job has not yet started. Permit expires today and extension still needs to be submitted.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TR-ROW-0226-00221
Permit Description: Application is for utility work involving a contractor who will be performing maintenance and repairs on water pipes within various locations throughout the neighborhood. The work will be concentrated in residential areas. 03/27/26- Revise plans where submitted for water line. 06/02/26- Renew permit for 90 days as of 06/02/26 new expiration date is 08/31/26.
Total Completed Inspections - 5
Date Description Inspector Results Comments
06/18/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed on-site meeting with Tucson water and Inova. Barricade mobilization scheduled for Wednesday, 6/24.
08/31/2026 TRSP - ROW - SITE INSPECTION Passed inspected site thoroughly, work is still ongoing. Piles for spoils and important materials are in place with waddles recent rain has caused muddy work areas that will need cleanup prior to paving phase.
09/25/2026 TRSP - ROW - Barricade - Setup/Routine Passed job is ongoing working under new permit TR-ROW-0726-00867
09/25/2026 TRSP - ROW - Backfill - Placement/Compaction Passed job is ongoing working under new permit TR-ROW-0726-00867
09/25/2026 TRSP - ROW - Final Passed job is ongoing working under new permit TR-ROW-0726-00867

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
SAN PAULO PH 2C_100 STAMPED_03-13-2026 (1) (002)_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 70920 - SAN PAULO VILLAGE PH 2C - ALL PAGES_V1.PDF DOCUMENTS VIEW
DB 70920 - SAN PAULO VILLAGE PH 2C - OVERVIEW_V1.PDF DOCUMENTS VIEW
SAN PAULO PH 2C_50 DESIGN_V1.PDF DOCUMENTS VIEW