Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
4340 S PASEO MELODIOSO
Apply Date:
02/17/2026
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
Need to trench along Melpomene/Paseo Melodioso to bring power to 4340 S. Paseo Melodioso for a new SFR being built

Permit Reviews

Permit Number - TR-ROW-0226-00203
Permit Status: Complete
Permit Description: Need to trench along Melpomene/Paseo Melodioso to bring power to 4340 S. Paseo Melodioso for a new SFR being built
Start Date Submittal Complete Date Status  
02/25/2026 RIGHT-OF-WAY REVIEW v.2 02/25/2026 APPROVED Review Details
02/18/2026 RIGHT-OF-WAY REVIEW v.1 02/20/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0226-00203
Permit Status: Complete
Permit Description: Need to trench along Melpomene/Paseo Melodioso to bring power to 4340 S. Paseo Melodioso for a new SFR being built
Total Outstanding Activity Conditions - 4
Date Name
02/20/2026 Traffic Control set-up approved between 7AM - 5PM
02/25/2026 City of Tucson Right of Way Only
02/25/2026 Pre-Activity Meeting
02/25/2026 Private Property

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0226-00203
Permit Description: Need to trench along Melpomene/Paseo Melodioso to bring power to 4340 S. Paseo Melodioso for a new SFR being built
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/09/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed freak on meeting with Ted Bedard from Bednar construction 811 incomplete, they will be coming out of a transformer at at the north east corner of the property TP transformer not marked gas line not marked waterline not marked contractor was advised until 811 is updated. They are not allowed to trench anything. They will be trenching right alongside the property line which they’re spoils will not get into street. He was advised of traffic control, warning signs. Any open trenches need to be secured. Anything left open cannot just be unsecured.
04/03/2026 TRSP - ROW - Barricade - Setup/Routine Passed Work is now complete and traffic control has been removed from the job site.
04/03/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
04/03/2026 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
26-0028_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
ROW SITE PLAN_V1.PDF DOCUMENTS VIEW