Permit: TR-ROW-0226-00171
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3920 S SILVER BEECH AV
Address NEW:
3920 S SILVER BEECH AV
Apply Date:
02/09/2026
Applicant:
Description:
sidewalk repair for 2 panels at 4x8 each with notice of violation.
Permit Reviews
Permit Number - TR-ROW-0226-00171
Permit Status: Complete
Permit Description: sidewalk repair for 2 panels at 4x8 each with notice of violation.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/11/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0226-00171
Permit Status: Complete
Permit Description: sidewalk repair for 2 panels at 4x8 each with notice of violation.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/11/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 02/11/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/11/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0226-00171
Permit Description: sidewalk repair for 2 panels at 4x8 each with notice of violation.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with the homeowner several times over the phone. Pre-activity meeting is now complete and work can begin at the homeowners discretion. | |
| 02/26/2026 | TRSP - ROW - Final | Passed | Work is complete | |
| 02/25/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Work is complete | |
| 02/25/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Work is complete | |
| 02/25/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Sidewalk was closed to pedestrian traffic while work was completed. |