Permit: TR-ROW-0226-00149
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2531 N SPARKMAN BL
Address NEW:
2531 N SPARKMAN BL
Apply Date:
02/04/2026
Applicant:
ANGEL MORALES
Description:
Cipp Lining, Concrete collar around sewer manhole
Permit Reviews
Permit Number - TR-ROW-0226-00149
Permit Status: Complete
Permit Description: Cipp Lining, Concrete collar around sewer manhole
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/09/2026 | REQUIRES RESUBMIT |
| 02/10/2026 | RIGHT-OF-WAY REVIEW v.3 | 02/11/2026 | APPROVED |
| 02/09/2026 | RIGHT-OF-WAY REVIEW v.2 | 02/09/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0226-00149
Permit Status: Complete
Permit Description: Cipp Lining, Concrete collar around sewer manhole
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/09/2026 | Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way. |
| 02/09/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 02/09/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/09/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property |
| 02/09/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0226-00149
Permit Description: Cipp Lining, Concrete collar around sewer manhole
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/16/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/16/2026 | TRSP - ROW - Final | Passed |