Permit: TR-ROW-0226-00148
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3638 N FAIRVIEW AV
Address NEW:
3638 N FAIRVIEW AV
Apply Date:
02/04/2026
Applicant:
ANGEL MORALES
Description:
Cipp Lining, replace Existing Concrete collar around sewer manhole
Permit Reviews
Permit Number - TR-ROW-0226-00148
Permit Status: Complete
Permit Description: Cipp Lining, replace Existing Concrete collar around sewer manhole
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/18/2026 | RIGHT-OF-WAY REVIEW v.2 | 02/24/2026 | APPROVED |
| 02/04/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/17/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0226-00148
Permit Status: Complete
Permit Description: Cipp Lining, replace Existing Concrete collar around sewer manhole
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/09/2026 | PRE-CON |
| 02/09/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/24/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 02/24/2026 | Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0226-00148
Permit Description: Cipp Lining, replace Existing Concrete collar around sewer manhole
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | manhole restoration at Prince and Fairview headed north on Fairview requesting night work and a TNE today putting out pre-warmers at Princeton Fairview and on the north end of Fairview for work beginning sometime next week | |
| 03/24/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | barricade set up was done at night | |
| 03/24/2026 | TRSP - ROW - Final | Passed | All work on this permit has been completed and was completed at night. They did aligning in the sewer and they did three manhole cover rehabs all work has been completed. |