Permit: TR-ROW-0226-00146
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
7766 E POINCIANA DR
Address NEW:
7766 E POINCIANA DR
Apply Date:
02/04/2026
Applicant:
Robert Kaylor
Description:
sidewalk repair with notice of violation
Permit Reviews
Permit Number - TR-ROW-0226-00146
Permit Status: Complete
Permit Description: sidewalk repair with notice of violation
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/05/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0226-00146
Permit Status: Complete
Permit Description: sidewalk repair with notice of violation
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/05/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/05/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 02/05/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0226-00146
Permit Description: sidewalk repair with notice of violation
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Site is ready for work to begin. Demo has already been completed and forms are in place. | |
| 02/17/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Sidewalk is closed during the sidewalk repair process | |
| 02/19/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Work is complete | |
| 02/19/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Work is complete | |
| 02/23/2026 | TRSP - ROW - Final | Passed | Work is complete |