Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
124 W 20TH ST
Address NEW:
124 W 20TH ST
Apply Date:
02/02/2026
Applicant:
Cameron Bonner
Description:
Clean existing line and manhole benches. Install 240 LF of CIPP

Permit Reviews

Permit Number - TR-ROW-0226-00130
Permit Status: Complete
Permit Description: Clean existing line and manhole benches. Install 240 LF of CIPP
Start Date Submittal Complete Date Status  
02/02/2026 RIGHT-OF-WAY REVIEW v.1 02/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0226-00130
Permit Status: Complete
Permit Description: Clean existing line and manhole benches. Install 240 LF of CIPP
Total Outstanding Activity Conditions - 3
Date Name
02/04/2026 PRE-CON/SIDEWALK
02/04/2026 Traffic Control set-up approved between 7AM - 5PM
02/05/2026 If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103)

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0226-00130
Permit Description: Clean existing line and manhole benches. Install 240 LF of CIPP
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/20/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/24/2026 TRSP - ROW - Barricade - Setup/Routine Passed
03/24/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
03/24/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
325031 - SITE 1 FMP MAP (124 W 20TH ST)_V1.PDF DOCUMENTS VIEW
DB 72033 - SITE 1 - 124 W 20TH ST - FOOTBALL - 325031_V1.PDF DOCUMENTS VIEW