Permit: TR-ROW-0225-00270
Permit Details
Apply Date:
02/25/2025
Applicant:
ANGEL MORALES
Description:
We are looking to fully close off a (2) drives along Prince and partially close (1) along with adding the (2) speed tables on Caballero PL 5/27- revision to TCP - (Message boards required 5 days in advance of Double Lane shift- Zane)
Permit Reviews
Permit Number - TR-ROW-0225-00270
Permit Status: Complete
Permit Description: We are looking to fully close off a (2) drives along Prince and partially close (1) along with adding the (2) speed tables on Caballero PL
5/27- revision to TCP - (Message boards required 5 days in advance of Double Lane shift- Zane)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/30/2025 | RIGHT-OF-WAY REVIEW REVISION v.3 | 05/30/2025 | APPROVED |
| 05/27/2025 | RIGHT-OF-WAY REVIEW REVISION v.2 | 05/27/2025 | REQUIRES RESUBMIT |
| 02/26/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/28/2025 | REQUIRES RESUBMIT |
| 05/21/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 05/22/2025 | REQUIRES RESUBMIT |
| 02/28/2025 | RIGHT-OF-WAY REVIEW v.2 | 04/28/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0225-00270
Permit Status: Complete
Permit Description: We are looking to fully close off a (2) drives along Prince and partially close (1) along with adding the (2) speed tables on Caballero PL
5/27- revision to TCP - (Message boards required 5 days in advance of Double Lane shift- Zane)
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 02/28/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 02/28/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/05/2025 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 03/05/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 03/05/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 05/30/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 05/30/2025 | Message Board to be placed on Right of Way 5 days in advance of work and Double lane traffic shift. Boards to be located on WB Prince Road and Flowing Wells Rd |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0225-00270
Permit Description: We are looking to fully close off a (2) drives along Prince and partially close (1) along with adding the (2) speed tables on Caballero PL
5/27- revision to TCP - (Message boards required 5 days in advance of Double Lane shift- Zane)
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/02/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/03/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 06/02/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 06/05/2025 | TRSP - ROW - Final | Passed |