Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0225-00239
Permit Details
Apply Date:
02/20/2025
Applicant:
Armando Bracamonte
Description:
The Contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location. Permit update 4/11/2025: Renewal request for 60 days.
Permit Reviews
Permit Number - TR-ROW-0225-00239
Permit Status: Complete
Permit Description: The Contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Permit update 4/11/2025: Renewal request for 60 days.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0225-00239
Permit Status: Complete
Permit Description: The Contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Permit update 4/11/2025: Renewal request for 60 days.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/25/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 02/25/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0225-00239
Permit Description: The Contractor will be installing Metro Signs for Armando Bracamonte for the City of Tucson. 1 Hour max at each location.
Permit update 4/11/2025: Renewal request for 60 days.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/11/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/11/2025 | TRSP - ROW - Final | Passed |