Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
817 S 10TH AV
Address NEW:
817 S 10TH AV
Apply Date:
02/19/2025
Applicant:
CAITLIN RIPLEY - SOUTHWEST BARRICADES
Description:
this is a potholing project for the city of tucson and tucson water. 29 holes total from w 19th st north to cushing along 10th and Main. (PM Ilan Ibarra - Tucson Water)

Permit Reviews

Permit Number - TR-ROW-0225-00232
Permit Status: Complete
Permit Description: this is a potholing project for the city of tucson and tucson water. 29 holes total from w 19th st north to cushing along 10th and Main. (PM Ilan Ibarra - Tucson Water)
Start Date Submittal Complete Date Status  
02/27/2025 RIGHT-OF-WAY REVIEW v.2 03/12/2025 APPROVED Review Details
02/23/2025 RIGHT-OF-WAY REVIEW v.1 02/27/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0225-00232
Permit Status: Complete
Permit Description: this is a potholing project for the city of tucson and tucson water. 29 holes total from w 19th st north to cushing along 10th and Main. (PM Ilan Ibarra - Tucson Water)
Total Outstanding Activity Conditions - 3
Date Name
02/27/2025 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
02/27/2025 PRE-CON/PAVEMENT/SIDEWALK
02/27/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0225-00232
Permit Description: this is a potholing project for the city of tucson and tucson water. 29 holes total from w 19th st north to cushing along 10th and Main. (PM Ilan Ibarra - Tucson Water)
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/17/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/07/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
BINDER1_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
ILAN IBARRA PM_V1.PDF DOCUMENTS VIEW
PAGES FROM HORROCKS - SUE TUCSON WATER 10TH MAIN SEPR_V1.PDF DOCUMENTS VIEW