Permit: TR-ROW-0225-00227
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1016 N COUNTRY CLUB RD
Address NEW:
1016 N COUNTRY CLUB RD
Apply Date:
02/18/2025
Applicant:
ANGEL MORALES
Description:
24 hrs closure with ADA access path. Remove and relace 325’ of standard sidewalk and 1 standard ramp.***
Permit Reviews
Permit Number - TR-ROW-0225-00227
Permit Status: Complete
Permit Description: 24 hrs closure with ADA access path. Remove and relace 325’ of standard sidewalk and 1 standard ramp.***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0225-00227
Permit Status: Complete
Permit Description: 24 hrs closure with ADA access path. Remove and relace 325’ of standard sidewalk and 1 standard ramp.***
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/26/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 02/26/2025 | sidewalk |
| 02/28/2025 | The following extended traffic control set-up times were approved: |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0225-00227
Permite Description: 24 hrs closure with ADA access path. Remove and relace 325’ of standard sidewalk and 1 standard ramp.***
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Partial Pass | |
| 03/05/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0225-00227
Permit Description: 24 hrs closure with ADA access path. Remove and relace 325’ of standard sidewalk and 1 standard ramp.***
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/10/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 03/10/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 03/26/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/22/2025 | TRSP - ROW - Final | Passed |