Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
123 W BROADWAY BL
Apply Date:
02/13/2025
Applicant:
Jacque Beamer
Description:
Filming a television commercial for Kenworth Trucks. The truck will drive a route on the streets selected and a camera car will accompany it. Point control will be used for rolling operation between hours of Approximately 6:30 pm - 9:30 pm

Permit Reviews

Permit Number - TR-ROW-0225-00208
Permit Status: Complete
Permit Description: Filming a television commercial for Kenworth Trucks. The truck will drive a route on the streets selected and a camera car will accompany it. Point control will be used for rolling operation between hours of Approximately 6:30 pm - 9:30 pm
Start Date Submittal Complete Date Status  
02/19/2025 RIGHT-OF-WAY SIMPLE REVIEW v.1 02/24/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0225-00208
Permit Status: Complete
Permit Description: Filming a television commercial for Kenworth Trucks. The truck will drive a route on the streets selected and a camera car will accompany it. Point control will be used for rolling operation between hours of Approximately 6:30 pm - 9:30 pm
Total Outstanding Activity Conditions - 3
Date Name
02/19/2025 The following extended traffic control set-up times were approved:
02/19/2025 Bus Stop/Route
02/19/2025 SunLink Track Access

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0225-00208
Permit Description: Filming a television commercial for Kenworth Trucks. The truck will drive a route on the streets selected and a camera car will accompany it. Point control will be used for rolling operation between hours of Approximately 6:30 pm - 9:30 pm
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/03/2025 TRSP - ROW - Barricade - Setup/Routine Passed
03/03/2025 TRSP - ROW - Barricade Takedown Passed