Permit: TR-ROW-0225-00199
Permit Details
Apply Date:
02/13/2025
Applicant:
Description:
WHELCON CONTRACTING WILLBE REMOVING AND REPLACING ADA RAMPS THROUGHOUT THE NEIGHBORHOODS OF MANANA GRANDE, ROLLING HILLS, VISTA DEL SIERRAS & BUTTERFIELD RANCH.
Permit Reviews
Permit Number - TR-ROW-0225-00199
Permit Status: Inspections
Permit Description: WHELCON CONTRACTING WILLBE REMOVING AND REPLACING ADA RAMPS THROUGHOUT THE NEIGHBORHOODS OF MANANA GRANDE, ROLLING HILLS, VISTA DEL SIERRAS & BUTTERFIELD RANCH.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/18/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0225-00199
Permit Status: Inspections
Permit Description: WHELCON CONTRACTING WILLBE REMOVING AND REPLACING ADA RAMPS THROUGHOUT THE NEIGHBORHOODS OF MANANA GRANDE, ROLLING HILLS, VISTA DEL SIERRAS & BUTTERFIELD RANCH.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/14/2025 | The following extended traffic control set-up times were approved: 6:00 AM to 5:00 PM |
| 02/14/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/14/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0225-00199
Permit Description: WHELCON CONTRACTING WILLBE REMOVING AND REPLACING ADA RAMPS THROUGHOUT THE NEIGHBORHOODS OF MANANA GRANDE, ROLLING HILLS, VISTA DEL SIERRAS & BUTTERFIELD RANCH.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | The project area has recently received a surface treatment. Work is complete. | |
| 05/21/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work is complete | |
| 05/21/2025 | TRSP - ROW - Final | Passed | Work is complete |