Permit: TR-ROW-0225-00195
Permit Details
Apply Date:
02/12/2025
Applicant:
Erica Goldston
Description:
Hunter will be installing approximately 3470 LF of 6" DIP and a section of approximately 500 LF of 8" DIP of water main. Hunter will also installing fire hydrants, valves and water meter relocations, service connections, pavement replacement.
Permit Reviews
Permit Number - TR-ROW-0225-00195
Permit Status: Complete
Permit Description: Hunter will be installing approximately 3470 LF of 6" DIP and a section of approximately 500 LF of 8" DIP of water main. Hunter will also installing fire hydrants, valves and water meter relocations, service connections, pavement replacement.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/18/2025 | APPROVED |
| 02/26/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 02/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0225-00195
Permit Status: Complete
Permit Description: Hunter will be installing approximately 3470 LF of 6" DIP and a section of approximately 500 LF of 8" DIP of water main. Hunter will also installing fire hydrants, valves and water meter relocations, service connections, pavement replacement.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/14/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/14/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 02/14/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 02/27/2025 | The following extended traffic control set-up times were approved: |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0225-00195
Permit Description: Hunter will be installing approximately 3470 LF of 6" DIP and a section of approximately 500 LF of 8" DIP of water main. Hunter will also installing fire hydrants, valves and water meter relocations, service connections, pavement replacement.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Erica over the phone. She is the on-site project engineer for Hunter construction. She stated that work would begin on Monday, March 3. | |
| 05/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Traffic control is set up in accordance with the approved TCP. | |
| 10/22/2026 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | Work is complete | |
| 10/22/2026 | TRSP - ROW - Barricade Takedown | Passed | Work is complete | |
| 10/22/2026 | TRSP - ROW - Final | Passed | Work is complete |