Permit: TR-ROW-0225-00184
Permit Details
Apply Date:
02/07/2025
Applicant:
Al Coronado
Description:
Small sewer line replacement, approximately 5 feet below the sidewalk. We will be digging out and around pipe to gain a workable area. For the small repair we will be replacing the clay pipe with new ABS pipe.
Permit Reviews
Permit Number - TR-ROW-0225-00184
Permit Status: Complete
Permit Description: Small sewer line replacement, approximately 5 feet below the sidewalk. We will be digging out and around pipe to gain a workable area. For the small repair we will be replacing the clay pipe with new ABS pipe.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/11/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0225-00184
Permit Status: Complete
Permit Description: Small sewer line replacement, approximately 5 feet below the sidewalk. We will be digging out and around pipe to gain a workable area. For the small repair we will be replacing the clay pipe with new ABS pipe.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/11/2025 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Al Coronado Plumbing to address because DTM did not have an opportunity to review, approve, or inspect the work. |
| 02/11/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 02/11/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0225-00184
Permit Description: Small sewer line replacement, approximately 5 feet below the sidewalk. We will be digging out and around pipe to gain a workable area. For the small repair we will be replacing the clay pipe with new ABS pipe.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/26/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 03/10/2025 | TRSP - ROW - Final | Passed |