Permit: TR-ROW-0225-00182
Permit Details
Apply Date:
02/07/2025
Applicant:
Description:
**24 HOUR CLOSURE** Wallcon Plumbing will be entering Glenn St to extend water utilities to new facility.*** Continuation permit TR-ROW-1124-01358 (Completion of Pavement Restoration Related to Scope of Work)
Permit Reviews
Permit Number - TR-ROW-0225-00182
Permit Status: Complete
Permit Description: **24 HOUR CLOSURE** Wallcon Plumbing will be entering Glenn St to extend water utilities to new facility.*** Continuation permit TR-ROW-1124-01358 (Completion of Pavement Restoration Related to Scope of Work)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0225-00182
Permit Status: Complete
Permit Description: **24 HOUR CLOSURE** Wallcon Plumbing will be entering Glenn St to extend water utilities to new facility.*** Continuation permit TR-ROW-1124-01358 (Completion of Pavement Restoration Related to Scope of Work)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 02/10/2025 | The following extended traffic control set-up times were approved: |
| 02/10/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 02/10/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 02/11/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/11/2025 | Multiple cuts means more than one and by the same permit. If multiple cuts and patches are made to the same street and within the existing pavement, the street surface for the duration of the cuts and patches shall be milled 2-inches and overlaid with 2-inches of a City approved asphalt mix on arterial and collector streets. For non-moratorium residential streets, if multiple cuts are made to the same street and within the same block (intersection to intersection), an approved SEAL COAT treatment shall be added to the surface of the patched area for the entire width of lane affected between cuts upon completion of the pavement patch in lieu of a mill and overlay. In residential areas, the treatment shall extend to the center of the street. If both sides of the street have been cut, the entire street shall be covered over between the limits of the first cut to the last cut on the same respective street. |
| 02/11/2025 | Patch limits for pavements not under moratorium shall follow a T-Top Detail (Exhibit A). T-Top patches in concrete pavement will require Class P concrete. Class S concrete may be used for T-top patches in all other pavement types. The Utility Company shall apply an approved SEAL COAT PRODUCT to the affected patch area for 25-ft beyond the trench limits in all travel directions and for the width of the lane affected. The SEAL COAT product must have the following characteristics to be considered: • Asphalt seal coat (airport grade?) • Black emulsion • Polymer modified • Surface preparation per manufacturer • Application made per manufacturer • Curing time between 8-24 hrs • Thickness applications required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0225-00182
Permit Description: **24 HOUR CLOSURE** Wallcon Plumbing will be entering Glenn St to extend water utilities to new facility.*** Continuation permit TR-ROW-1124-01358 (Completion of Pavement Restoration Related to Scope of Work)
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/20/2025 | TRSP - ROW - Final | Passed |